Steelworks Georgsmarienhütte GmbH

Georgsmarienhütte GmbH ist building a new cooling system for machine cooling in the course of the revision of the continuous casting plant. The contract was awarded as aturnkey system. SMB Rohrleitungsbau Wildau GmbH&Co.KG received the order and the cooling system will be realized in cooperation with Küttner GmbH&Co.KG in 2017.

The integration into the cycle and transfer to the client will take place during the summer shutdown in August 2017.

Our range of services:

Planning, prefabrication, supply and assembly of all piping systems, installation off fittings, coolers, measuring devices and assembly of the corresponding steel construction, including all stages.

Quantities

DNpressure stagemeter
15 - 350PN10 - 16550

Dedusting foundry M. Busch

In the course of the expansion of the foundry and melting plant, the company invested a double-digit million figure. The dedusting plant for the foundry was also completely renovated.

The new dedusting systemincludes ducts with max. Rectangular cross-section of 2400 x 2200 mm as well as pipes up to DN 800. Precise prefabrication of the ducts, determination of the ducts, determination of the spool sizes according to possibilities of placement in the hall, difficult assembly conditions and a tight time window were the special challenges.

Our range of services:

Delivery an assembly of the dedusting ducts with flaps and flaps for regulating the volume flow as well the correspnding structural steel constructions. In the course of the construction projekt, the scope of delivery increased from 55 tonnes to 120 tonnes.

quantities

DNcross section rectangulartonnage
150 - 8002400 x 2200 mmapprox. 120 t

Die SMB-Rohrleitungsbau Wildau GmbH & Co. KG win Future-Award 2009 of Brandenburg (Germany).


Cooperation with SAACKE GmbH:

Now also Competence in Sewage Teatment Plant - Technology